Aircraft carrier on course
The modernisation of INS Vikramaditya for the Indian Navy at the Sevmash shipyard has moved into the last stage. The picture shows the aircraft-carrier parked on the frozen sea. Source: RIA Novosti
Aircraft carrier on course
The modernisation of INS Vikramaditya for the Indian Navy at the Sevmash shipyard has moved into the last stage. The picture shows the aircraft-carrier parked on the frozen sea. Source: RIA Novosti
Last edited by bhramos; 08-02-12 at 04:57 AM.
from sevmash
btw, does anyone now where her homeport will be???
Vizag........
Last edited by Payeng; 11-02-12 at 12:01 AM. Reason: ooops spelling mistake
More Images
Courtesy http://fotografersha.livejournal.com
Last edited by Payeng; 10-02-12 at 04:48 PM.
And more
Courtesy Лысцева Марина
Maybe INS Kadamba at karwar
I think its Vizag port mate, so that its easy to patrol and counter PLAN threat in the Mallica straights easily...........
INDIA'S MOST POWERFULL NAVAL BASE KARWAR GET AIRCRAFT CARRIER
Caution India: INDIA'S MOST POWERFULL NAVAL BASE KARWAR GET AIRCRAFT CARRIER
I think viraat will be shifted to Bay of Bengal..
Slight OT but a hybrid STOBAR and CATOBAR system for the Russian Navy?
thats the best solution the Russians got for their existing planes can be on run too
Americans will demonstrate the E-2D to India, such an arrangement might be an answer for IN's fixed winged EW needs too.
Aircraft-Related Facilities of INS Vikramaditya Almost Ready
Aircraft-Related Facilities of INS Vikramaditya Almost Ready
Designers of JSC Sevmash shipyard are resolving complex technical issues when working on Project 11430 aircraft carrier INS Vikramaditya being modernized for Indian Navy, reports the shipyard's press service.
For Sevmash, INS Vikramaditya is one of the major projects to be completed in 2012. Main weapon of the carrier are deck-based fighters MiG-29K/KUB and helicopters Ka-28/31. Without special air-technical facilities, none of aircraft is able to take off the deck. The shipyard's designers along with representatives of Nevskoye Design Bureau and contracting parties are handling all technical problems related to the carrier's air wing.
Retrofitting of the carrier is coming to its end; most of mechanisms and systems have been already assembled and are pending trials. Three arresters have been mounted; braking systems and damping devices have been installed under deck. Mooring trials of arresters are finished, another stage is flight tests. Assembling of aircraft weapon elevators is at the final stage; those systems deliver weapons from ammunition room to aircraft on the flight deck. Three standard elevators have been already repaired, and the fourth one was designed by Nevskoye bureau, built by Sevmash and mounted on the ship. Racks for missiles and bombs have been made and assembled in ammunition rooms.
Installation of four fire-resistant curtains in hangar was finished in Jan 2012; in case of fire, they divide the hangar into five isolated sections stopping fire propagation. Designers resolved technical issues related to alignment of underway replenishment system, assembling of aircraft towing device, and placement of external fuel tanks for the ship's air wing.
INS Vikramaditya is expected to take sea for the first time and start trials on May 25.
Defenseblog-njs.blogspot.com
why cant we convert it into Helli Carrier!!! with adding some heli's to it, until INS Vikrant is arrived!!!